Welcome to visit ceramic rod Middia website

Relevant policies and market dynamics of the general machinery industry in the second quarter of 2022

Release time:2024-09-05click:0
As the epidemic situation improves, various departments have intensively introduced new policies for the manufacturing industry to inject new momentum into economic development. Local governments have also introduced relevant support policies, and a number of infrastructure and major engineering projects have started construction, which has brought great benefits to the manufacturing industry, especially equipment manufacturing. Many benefits.
The Exhibition and Media Center of China General Machinery Industry Association has specially collected and sorted out the recent policies and market information related to the general machinery industry, such as policies and regulations, park construction, project signing, and project commencement. Take a look at GM What policy dividends will the machinery industry enjoy? Let’s see what market opportunities there are in the general machinery industry!
Eleven departments: "Seven chains" promote the integration and innovation of large, small and medium-sized enterprises
The Ministry of Industry and Information Technology announced " Notice on Carrying out "Join Hand Action" to Promote Integration and Innovation of Large, Small and Medium-sized Enterprises (2022-2025)", which proposes new goals, new tasks, and new measures to promote integration and innovation of large, small and medium-sized enterprises. "Action Together" is jointly organized by the Ministry of Industry and Information Technology, the National Development and Reform Commission, the Ministry of Science and Technology, the Ministry of Finance, the Ministry of Human Resources and Social Security, the People's Bank of China, the State-owned Assets Supervision and Administration Commission of the State Council, the State Administration for Market Regulation, the China Banking and Insurance Regulatory Commission, the All-China Federation of Industry and Commerce, and the State Intellectual Property Office. Wait for the eleven departments to jointly issue it.
The Small and Medium Enterprises Bureau of the Ministry of Industry and Information Technology interpreted the "Join Hand Action" and stated that through departmental linkage, top-down promotion, and market drive, the innovation chain, industrial chain, supply chain, data chain, and capital chain of large and medium-sized enterprises will be promoted. , service chain, and talent chain are fully integrated, and efforts are made to build an enterprise development ecosystem in which large, medium and small enterprises are interdependent and mutually reinforcing, enhance the resilience and competitiveness of the industrial chain and supply chain, and enhance the modernization level of the industrial chain.
Seventeen departments jointly issued the "National Climate Change Adaptation Strategy 2035"
Ministry of Ecology and Environment, National Development and Reform The Committee, the Ministry of Science and Technology and 17 other departments jointly issued the National Climate Change Adaptation Strategy 2035 (hereinafter referred to as the Adaptation Strategy 2035) to make overall plans and arrangements for climate change adaptation from now to 2035.
Based on an in-depth assessment of climate change impact risks, climate change adaptation work and challenge opportunities, the "Adaptation Strategy 2035" puts forward the guiding ideology, basic principles and main goals in the new stage, and further Clarify the key areas, regional patterns and safeguard measures for my country’s adaptation to climate change. The "Adaptation Strategy 2035" clarifies that from now to 2035, adaptation to climate change should adhere to the principle of "active adaptation, prevention first, scientific adaptation, conforming to nature, systematic adaptation, outstandingFocusing on the basic principles of collaborative adaptation and joint governance, it is proposed that "by 2035, climate change monitoring and early warning capabilities will reach the international advanced level for the same period, the climate risk management and prevention system will be basically mature, and major climate-related disaster risks will be effectively prevented and controlled. The technology system and standard system for adapting to climate change will be more perfect, the ability of the whole society to adapt to climate change will be significantly improved, and a climate-adaptive society will be basically built."
Six departments jointly released "Industrial Energy Efficiency Improvement" Action Plan"
Recently, six departments including the Ministry of Industry and Information Technology, the National Development and Reform Commission, the Ministry of Finance, the Ministry of Ecology and Environment, the State-owned Assets Supervision and Administration Commission, and the State Administration for Market Regulation jointly issued the "Industrial Action Plan" "Energy Efficiency Improvement Action Plan"
The "Action Plan" focuses on key energy-consuming industries, key energy-consuming fields and key energy-consuming equipment, implements policies by industry, promotes classification, and systematically improves industrial energy efficiency levels; Strengthen full-chain, full-dimensional, and full-process energy management, strengthen standard guidance and energy-saving services, and collaboratively improve the energy efficiency levels of large and medium-sized enterprises and industrial parks; coordinate and optimize the industrial energy structure, digital empowerment, etc. to promote energy conservation and efficiency. Comprehensively improve the foundation of industrial energy efficiency
Six departments issued the "Industrial Water Efficiency Improvement Action Plan"
Six departments including the Ministry of Industry and Information Technology. The "Action Plan for Improving Industrial Water Efficiency" (hereinafter referred to as the "Action Plan") was recently issued, proposing that by 2025, the national water consumption per 10,000 yuan of industrial added value will decrease by 16% compared with 2020, and the water efficiency of key water use industries will be further improved, and the steel industry will further improve the water efficiency. The water consumption per unit of major products in the steel and paper industries decreased by 10%, the water consumption per unit of major products in the petrochemical and chemical industries decreased by 5%, and the water consumption per unit of major products in the textile, food, and non-ferrous metal industries further improved the level of industrial wastewater recycling. , striving to achieve a national water reuse rate of about 94% for large-scale industrial enterprises.
The relevant person in charge of the Department of Energy Conservation and Comprehensive Utilization of the Ministry of Industry and Information Technology said that industrial water consumption in 2021 will be 104.96 billion cubic meters, accounting for 104.96 billion cubic meters of water in the country. Since the "Thirteenth Five-Year Plan", industrial water efficiency has improved significantly. The national water consumption per 10,000 yuan of industrial added value has dropped from 58.3 cubic meters in 2015 to 28.2 cubic meters in 2021. The reuse rate of industrial water above designated size. It increased from 89% to 92.9%. However, water conservation and efficiency improvement in the industrial sector still faces mismatch between industrial structure layout and water resources conditions, low water reuse rate in some industries, insufficient utilization of unconventional water, and shortcomings in key technologies and equipment. Question.
Nine departments jointly issued the "14th Five-Year Plan for Renewable Energy Development Plan"
Recently, nine departments including the National Development and Reform Commission and the National Energy Administration jointly issued The "14th Five-Year Plan for Renewable Energy Development" (hereinafter referred to as the "Plan") was issued, clarifying that by 2025, the annual power generation capacity of renewable energy will reach approximately 3.3 trillion kilowatt-hours. During the "14th Five-Year Plan" period, the increase in renewable energy power generation accounted for more than 50% of the increase in electricity consumption in the whole society, and the power generation of wind power and solar power doubled.
The "Plan" proposes that by 2025, the total renewable energy consumption will reach about 1 billion tons of standard coal, accounting for about 18% of primary energy consumption; the country's total renewable energy power and The weight of non-hydropower consumption responsibilities reaches about 33% and 18% respectively, and the utilization rate remains at a reasonable level; the scale of non-electricity utilization such as solar thermal utilization, geothermal energy heating, biomass heating, and biomass fuel reaches more than 60 million tons of standard coal. .
Seven departments jointly issued the "Implementation Plan for Synergy and Efficiency of Pollution Reduction and Carbon Reduction"
Recently, the Ministry of Ecology and Environment, The National Development and Reform Commission, the Ministry of Industry and Information Technology, the Ministry of Housing and Urban-Rural Development, the Ministry of Transport, the Ministry of Agriculture and Rural Affairs, and the Energy Bureau jointly issued the "Implementation Plan for Synergetic Efficiency in Pollution Reduction and Carbon Reduction" (hereinafter referred to as the "Plan") to thoroughly implement the Party's The central government and the State Council have made decisions and arrangements on carbon peaking and carbon neutrality, implemented the relevant requirements for the construction of ecological civilization in the new development stage, and made systematic arrangements for promoting synergies in pollution reduction and carbon reduction.
The "Plan" adheres to the working principles of highlighting synergies, strengthening source prevention and control, optimizing technological paths, focusing on mechanism innovation, and encouraging pioneering trials, and proposes synergies for pollution reduction and carbon reduction by 2025. The work pattern for advancement has basically been formed, and the collaborative capabilities for pollution reduction and carbon reduction have been significantly improved by 2030, among other work goals. The "Plan" focuses on six main aspects and proposes important tasks and measures.
The Ministry of Industry and Information Technology issued the "Interim Measures for the Gradient Cultivation and Management of High-Quality Small and Medium-sized Enterprises"
Recently, the Ministry of Industry and Information Technology issued the "Gradient Cultivation and Management of High-Quality Small and Medium-sized Enterprises" The "Interim Measures for Cultivation and Management" (hereinafter referred to as the "Measures") clarifies the evaluation or identification standards for innovative small and medium-sized enterprises, specialized and special new small and medium-sized enterprises, and specialized, special and new "little giant" enterprises.
The "Measures" not only standardize the evaluation and identification work, but also provide guidance on cultivation and management.system requirements. The three gradients of high-quality small and medium-sized enterprises are clearly layered and connected with each other. It not only helps enterprises at different levels to see clearly the gaps and shortcomings and clarify the direction of efforts, but also helps the small and medium-sized enterprise authorities at all levels to improve the pertinence, accuracy and satisfaction of services. Spend. Carrying out gradient cultivation of high-quality enterprises is not only about identifying a group of high-quality enterprises, but more importantly, through cultivation services and guidance, leading the majority of small and medium-sized enterprises to adhere to the new development path of specialization and achieve high-quality development.
"Implementation Plan for the Renovation and Renovation of Aging Urban Gas Pipelines (2022-2025)" is issued
General Office of the State Council The "Implementation Plan for the Renovation and Renovation of Aging Urban Gas Pipelines and Other Aging Areas (2022-2025)" was recently issued. The "Implementation Plan" clearly states that in accordance with the principles of focusing on key points, putting safety first, understanding the bottom line, systematic management, adapting measures to local conditions, coordinating policies, paying equal attention to construction and management, and long-term management, we will comprehensively understand urban gas, water supply, drainage, heating, etc. On the basis of the baseline number of aging pipelines, we should immediately plan and deploy, promptly improve the policy system and working mechanism to adapt to the needs of renewal, accelerate the renewal and reconstruction of aging urban gas pipelines, and completely eliminate safety hazards. In 2022, we will promptly launch and implement a number of aging renovation projects. By the end of 2025, the aging renovation and renovation tasks such as urban gas pipelines will be basically completed.
The three departments have launched the implementation of the manufacturing technology basic project
The three departments including the Ministry of Human Resources and Social Security recently jointly announced The "Manufacturing Skills Basic Project Implementation Plan" guides various localities to accelerate the cultivation of high-quality skilled talents urgently needed for the high-quality development of the manufacturing industry.
The plan proposes that from 2022 to 2025, focus on key areas of the manufacturing industry, establish a national skills basic engineering training base, increase government subsidy training support for urgently needed occupational types, and promote the training of skilled talents Evaluation work, optimize the use of supporting support from the development environment and incentive mechanisms, and create a team of manufacturing skilled talents with sufficient quantity, reasonable structure, high quality and vitality.
The 2022 national energy-saving technology equipment product recommendation work in the field of industry and information technology has been launched
In order to implement the "Ten Ten The Fourth Five-Year Plan for "Industrial Green Development" will accelerate the promotion and application of advanced and applicable energy-saving technology and equipment products, promote energy conservation and carbon reduction, cost reduction and efficiency improvement of enterprises, and promote energy efficiency improvement in the industrial and information fields. The Ministry of Industry and Information Technology recently issued a notice to organize National Industry of the Year 2022and recommend work on energy-saving technology and equipment products in the information field.
The recommended energy-saving technologies, equipment and products should meet the needs of energy conservation, efficiency improvement and green and low-carbon development in my country's industrial and information fields during the "14th Five-Year Plan" period, and have advanced energy efficiency levels and mature technologies. It has the characteristics of reliability, good energy saving and economy, and great potential for promotion and application. In particular, it recommends a number of key core technologies that have reached the international advanced level and can realize energy saving and efficiency improvement of the whole process system. Specifically, it includes three categories: industrial energy-saving technology, energy-saving technology in the information field, and high-efficiency energy-saving equipment and products.
The Ministry of Finance issued a document to support "dual carbon" and promote green and low-carbon development
In order to implement the provisions of the Party Central Committee and the State Council Promote the major decision-making and deployment of carbon peaking and carbon neutrality, give full play to the role of financial functions, and promote the realization of the carbon peaking and carbon neutrality goal as scheduled. On May 30, the Ministry of Finance issued the "Financial Support to Do a Good Job in Carbon Peaking and Carbon Neutrality" Opinions".
It is reported that the "Opinions" support the work of carbon peak and carbon neutrality from four aspects: overall requirements, key directions and areas of support, fiscal policy measures, and safeguard measures. The "Opinions" propose that by 2030, a fiscal and taxation policy system conducive to green and low-carbon development will be basically formed, and a long-term mechanism to promote green and low-carbon development will be gradually established to promote the smooth realization of the carbon peak goal. Before 2060, the policy system for financial support for green and low-carbon development will be mature and sound, and the goal of carbon neutrality will be successfully achieved.
China Banking and Insurance Regulatory Commission: Invest more financial resources into green and low-carbon fields
A few days ago , China Banking and Insurance Regulatory Commission issued the "Green Finance Guidelines for the Banking and Insurance Industry", which will be implemented from June 1 to guide the banking and insurance industry to develop green finance and orderly promote carbon peaking and carbon neutrality.
There are 36 articles in the "Guidelines", which require banking and insurance institutions to promote green finance from a strategic perspective, increase support for green, low-carbon, and circular economies, and prevent environmental, social and governance risks. Improve its environmental, social and governance performance and promote the comprehensive green transformation of economic and social development.
Ministry of Water Resources: Finalizing key points for water conservancy infrastructure PPP projects
On June 9, it was learned from the Ministry of Water Resources that the Ministry of Water Resources Recently, a deployment meeting was held to promote the development of the PPP model of water conservancy infrastructure.We will carry out key tasks and emphasize that while continuing to increase government investment, we will give full play to the role of market mechanisms and attract more social capital to participate in water conservancy construction.
According to the latest "Guiding Opinions of the Ministry of Water Resources on Promoting the Development of the Government-Private Partnership (PPP) Model of Water Conservancy Infrastructure", in terms of cooperation methods, cooperation models will be selected by category. In view of the characteristics of water conservancy projects with strong public welfare, large investment scale, long construction cycle, and low return on investment, combined with the actual situation of the project, through franchising, purchase of services, equity cooperation, etc., we can flexibly adopt Build-Operate-Transfer (BOT), Build-own-operate-transfer (BOOT), build-own-operate (BOO), transfer-operate-transfer (TOT) and other models promote the construction and operation of water conservancy infrastructure.
The "Shanghai Energy Development "14th Five-Year Plan"" was issued
Recently, the Shanghai Municipal People's Government issued the " Shanghai Energy Development “14th Five-Year Plan”. The "Plan" proposes to vigorously develop renewable energy and transform renewable energy into both centralized and distributed energy.
Implement the "Photovoltaic +" special project, combine land and roof resources, promote photovoltaic development by industry and field, and strive to increase the scale of photovoltaic by 2.7 million kilowatts. Offshore wind power will focus on promoting the development of wind power in the three major sea areas of Fengxian, Nanhui and Jinshan, explore and implement pilot demonstrations of distributed wind power in far-reaching sea areas and onshore, and strive to increase the scale of 1.8 million kilowatts. Combining the utilization of waste resources to promote the construction of biomass power generation projects, the new scale will be approximately 400,000 kilowatts. Promote the development of geothermal energy according to local conditions, and research and explore pilot demonstrations of tidal energy.
The “14th Five-Year Plan for Energy Development in Guangdong Province” was released
On April 13, the People’s Government of Guangdong Province The government released the "14th Five-Year Plan for Energy Development in Guangdong Province", which positions the development of hydrogen energy. According to the plan content: "Create a highland for the development of the hydrogen energy industry, expand the hydrogen energy application market through multiple channels, and focus on the core technology of hydrogen energy. R&D and advanced equipment manufacturing will accelerate the cultivation of the entire industrial chain layout of hydrogen production, storage, transportation, fuel cell stacks, key components and power system integration, electrolytic water hydrogen production, natural gas hydrogen production, and industrial by-product hydrogen purification equipment manufacturing industries, and promote The manufacturing of high-density hydrogen storage equipment will strengthen the construction of high-pressure gaseous hydrogen storage in the short term and the long-term layout of low-temperature liquid hydrogen and low-pressure solid hydrogen storage industries will take advantage of the regional first-mover advantage of the low-temperature hydrogen fuel cell industry to form the Guangzhou-Shenzhen-Foshan-Ring Greater Bay Area nuclear power plant.Fuel cell industry cluster in the heart of the city. ”
The content of the plan focuses more on technological innovation areas, demonstration projects, and industrial park construction. Guangzhou, Foshan, Dongguan, Yunfu, Huizhou, Maoming, Dongguan, and Zhanjiang are hydrogen energy parks. Gathering place
Hubei released the “14th Five-Year Plan” for energy development
According to the “10th Five-Year Plan for Energy Development in Hubei Province” According to the Fourth Five-Year Plan (hereinafter referred to as the Plan), by 2035, the construction of a new power system with new energy as the main body will achieve substantial results, a clean, low-carbon, safe and efficient modern energy system will be basically built, and the energy security capability will be greatly improved.
According to the plan, Hubei Province will build three major hubs (the national power grid interconnection hub, the national natural gas pipeline network hub, the "Two Lakes and One Hubei") around the goal of building a clean, low-carbon, safe and efficient energy system. "Jiangjiang" coal logistics hub), implement the "eight major energy projects" - new energy doubling project, coal and electricity green transformation project, wind, solar, water, thermal storage and source grid load storage integration demonstration project, energy reserve peaking project, "two lines and one "Dianyiwang" power grid project, "Five vertical, four horizontal and one channel" oil and gas pipeline network project, digital energy project and energy project to benefit enterprises and people.
Fujian Province issued the "Ten The Fourth Five-Year Plan for Energy Development
On June 1, the General Office of the Fujian Provincial People’s Government issued a notice on the issuance of Fujian Province’s “14th Five-Year Plan” for energy development.
The plan points out that the goal is to further optimize the energy structure during the "14th Five-Year Plan" period, and control the total energy consumption within the national targets by 2025. The production capacity will reach 54 million tons of standard coal. In 2025, the proportion of coal in energy consumption will decrease from 48.3% in 2020 to 48.2%, and the proportion of clean energy will increase from 28.1% to 33.6%. Petroleum 18.2%, natural gas 6.2%, non-fossil energy 27.4% (including nuclear, water, wind, light, biomass)
Shaanxi's "Roadmap" for the development of the petrochemical and chemical industry during the "14th Five-Year Plan" was announced
Recently, the Shaanxi Provincial Department of Industry and Information Technology issued the "Shaanxi Province's "14th Five-Year Plan" for High-end Petrochemical Industry Chemical Industry Development Plan. By strengthening technological innovation, optimizing the industrial structure, and further extending and coupling the industrial chain, we will promote the development of the high-end petrochemical and chemical industry. It is estimated that during the "14th Five-Year Plan" period, the cumulative new investment will be about 200 billion yuan, and the new output value will be about 60 billion yuan. The output value of the petrochemical industry will reach more than 350 billion yuan, and high-end new chemical materials and fine chemicals will account for more than 30% of the industry.
The "Plan" will improve the basic guarantee level of industrial development, accelerate the cultivation and formation of a characteristic and differentiated high-end chemical new material industry cluster, and give full play to the development advantages of the rubber chemical industry to create a "low-carbon "New kinetic energy for chemical industry development is the focus of the "14th Five-Year Plan". At the same time, four industrial clusters are planned: modern coal chemical industry and petrochemical industry, new chemical materials, rubber chemical industry and green chemical industry. Among them, modern coal chemical industry and petrochemical industry cluster include coal quality utilization and downstream, coal to olefins and downstream, coal to Aromatics/ethylene glycol downstream, coal-to-liquids, refining and chemical integration, coal-to-chemicals and downstream industries.
Hebei Province released the “14th Five-Year Plan” new energy storage development plan
On April 10, Hebei Provincial Development and Reform Commission The "Hebei Province "14th Five-Year Plan" New Energy Storage Development Plan" was issued. The document proposes that by 2025, the province will deploy and build new energy storage with a scale of more than 4 million kilowatts.
The plan proposes to widely apply new energy storage in power sources, power grids, users and other links, enhance the source, grid and load storage supporting capabilities and safety supervision capabilities, and promote the deep integration of "new energy + energy storage" , realize integrated planning, synchronous construction, and joint operation, and enhance the power grid and terminal energy storage regulation capabilities.
Gansu provincial enterprises implement seven major projects in the new energy industry to build a new energy industry chain system
Recently, Gansu The Provincial Government's State-owned Assets Supervision and Administration Commission issued the "Provincial Enterprise New Energy and Equipment Manufacturing Industry Action Plan" which proposes that from now to 2025, provincial enterprises will focus on the development of new energy resources, enhance new energy installed capacity, develop wind power, photovoltaic, transmission and Power distribution, energy storage, hydrogen energy, nuclear power, geothermal energy equipment manufacturing, implement seven major projects in the new energy industry, strive to build a new energy industry chain system, and build a new energy and new energy equipment manufacturing base.
These seven major projects include the new energy installed capacity expansion project, the wind power equipment industry chain improvement project, the optoelectronic equipment industry chain advancement project, the intelligent power transmission and distribution equipment manufacturing chain replenishment project, and new energy design Construction operation and maintenance collaborative project, strategic emerging industry cultivation project and technological innovation capability breakthrough project, etc. Through seven major projects, we strive to achieve 12 million kilowatts of newly installed new energy capacity by provincial enterprises by 2025, new investment in new energy power stations and equipment manufacturing exceeding 60 billion yuan, and new output value of 15 billion yuan.
Liaoning promotes the early implementation of 24 qualified major projects such as nuclear power and pumped hydro energy storage
June 2 , the Liaoning Provincial Government issued a notice on the issuance of "Several Measures for Liaoning Province to Implement the State Council's Package of Policies and Measures to Solidly Stabilize the Economy". The notice proposed to promote the construction of energy projects. Promote the early implementation of 24 qualified major projects such as nuclear power, pumped hydropower storage, high-voltage power transmission, LNG gas storage, and large-scale wind power and photovoltaic bases.
Accelerate the construction of Xudabao Nuclear Power Units 3 and 4, strive for early approval of Units 1 and 2, and strive to put Unit 6 of Hongyanhe Nuclear Power Phase II into operation within the year. Promote the construction of the first phase of the Qingyuan pumped storage project and strive to start construction of the Zhuanghe pumped storage project within this year. Accelerate the construction of the Huaneng Dalian Second Thermal Power Plant's "upgrading to large and suppressing small" projects, and promote the start of China Resources Shenyang's off-site thermal power upgrade project within the year.
Hunan plans to build 809 infrastructure projects in the “14th Five-Year Plan”
On May 30, Hunan held a comprehensive Provincial Infrastructure Construction and "Three Major Supports" Work Promotion Meeting". The meeting pointed out that Hunan plans to complete 809 infrastructure project construction tasks during the "14th Five-Year Plan" period, with a total investment of 3,018.08 billion yuan.
It is understood that among these projects, 240 were newly started this year with a total investment of 426.21 billion yuan, 412 were continued with a total investment of 1.78 trillion yuan, and 157 major preliminary projects were completed with a total investment of 804.16 billion yuan.
Inner Mongolia launches a major demonstration project of "dual carbon" scientific and technological innovation to "unveil the list and take charge"
On June 7, it was learned from the Inner Mongolia Department of Science and Technology that in order to quickly implement the "double carbon" scientific and technological innovation work in the region, Inner Mongolia follows the policy of "deploying innovation chains around the industrial chain and laying out the industrial chain around the innovation chain." In principle, closely following the overall requirements for scientific and technological innovation in the "dual carbon" field of the autonomous region, the first batch of technology lists for the "unveiling and leading" projects of the autonomous region's "dual carbon" major scientific and technological innovation demonstration projects in 2022 were released to select scientific research teams from across the country to solve Inner Mongolia's "dual carbon" scientific and technological innovation major demonstration projects. Major scientific and technological problems in the field of "double carbon". This move marks the official launch of Inner Mongolia’s “Double Carbon” major technological innovation demonstration project.
The list of "unveiling and leading" projects in the "dual carbon" field of the autonomous region released this time includes a total of 12 major technological innovation demonstration projects, with project support funds of nearly 150 million yuan.
On April 20, Sichuan Province started the construction of 12 key water conservancy projects
The project has a total investment of 26.8 billion yuan and involves 11 cities (states). After the project is completed, the total storage capacity and average annual water supply capacity will be 700 million cubic meters, the irrigation area will be increased and improved by 1.54 million acres, and the population will benefit from 5.17 million people. It is of great significance to ensuring the safety of flood prevention and drought relief, water supply security, and food security in the province.
According to reports, the 12 projects started this time are divided into 1 large irrigation area, 6 large, medium and small reservoirs, 3 rural water supply projects, 2 other projects, 12 The total project investment is 26.8 billion yuan.
Shandong strives to double the installed capacity of new energy during the “14th Five-Year Plan”
The Shandong Provincial Government Information Office announced in April A press conference was held on the 7th to interpret the newly issued "Shandong Province's 14th Five-Year Plan for Addressing Climate Change." Wang Fudong, deputy director of the Shandong Provincial Energy Bureau, said at the meeting that in order to help combat climate change to be effective, the province's energy structure will be further optimized.
Specifically, combined with the construction of natural gas pipeline networks and LNG receiving stations, and giving full consideration to regional power and heat demand, gas source security, etc., Shandong will give priority to load center cities and cities along gas pipelines, focusing on Arrange heavy-duty gas turbine projects; rationally deploy them in industrial parks, industrial clusters and other areasThe Bureau is building distributed gas turbine projects; in renewable energy bases such as Lubei, it is actively developing "wind, solar, fuel and storage integration" projects. In addition to fully completing the first batch of "5+2" energy storage demonstration projects and launching a new round of demonstration and promotion actions in due course, Shandong will also increase the demonstration application of compressed air energy storage, focus on cultivating new energy storage bases in Tai'an and other regions, and support the construction of independent storage Energy facilities, promote the rational allocation of energy storage facilities in new energy stations, and guide qualified new energy projects to explore the application of hydrogen production; accelerate the construction of Yimeng, Wendeng, Weifang, Tai'an Phase II pumped storage power stations, start Zaozhuang Zhuangli, Laiwu Shipyard, Qingzhou Zhuya and other project construction, promote the rolling acceptance of reserve sites, conduct a resource survey of small and medium-sized pumped storage power station sites, and start development and construction in a timely manner.
Shenzhen cultivates, develops and expands the "20+8" industrial cluster
On June 6, Shenzhen issued the "About Development "Opinions on Strengthening Strategic Emerging Industry Clusters and Cultivating and Developing Future Industries" proposed 20 key subdivisions for the development of strategic emerging industries and 8 key development directions for future industries.
This "20+8" industrial cluster "points to" the establishment of a manufacturing city, which will stabilize the basic market of Shenzhen's manufacturing industry and keep the proportion of manufacturing added value in regional GDP basically stable. , It is of great significance to enhance the development potential of the real economy and accelerate the construction of a technological and industrial innovation highland with global influence. Shenzhen has also set a goal: by 2025, the added value of strategic emerging industries will exceed 1.5 trillion yuan, becoming the main engine for promoting high-quality economic and social development.
Who among the 12 places mentioned in the “14th Five-Year Plan” related plans include nuclear power/nuclear energy?
Among the relevant policies of the “14th Five-Year Plan” in various places, 12 places mention nuclear energy and nuclear power. In addition to large-scale nuclear power projects, small nuclear heating reactors may also become the focus of future layout.
Jilin Province, Henan Province, and Guizhou Province have not yet completed and put into operation nuclear power projects, but they all mentioned nuclear energy small reactor heating projects and nuclear energy in the relevant plans of the "14th Five-Year Plan". Heating. Jilin Province stated that it will actively and steadily promote nuclear energy heating demonstrations. Henan Province stated that it will focus on the advanced technology of small nuclear energy reactors and launch research on small nuclear energy heating reactor demonstration projects in a timely manner in places with suitable conditions. Guizhou Province stated that it has been included in the national pilot demonstration nuclear energy small reactor heating project, accelerating the progress of preliminary work, and striving to "o;Construction has started during the 14th Five-Year Plan.
Old gas pipelines have started the “concentrated overhaul” mode
A few days ago, The General Office of the State Council issued the "Implementation Plan for the Aging Renovation and Renovation of Urban Gas Pipelines and Other Aging Pipelines (2022-2025)" (2022-2025), proposing to speed up the aging renovation and renovation work of urban gas pipelines and completely eliminate safety hazards. This year, a number of aging renovation and renovation projects will be launched as soon as possible. By the end of 2025, the task of upgrading and upgrading urban gas pipelines will be basically completed.
Previously, the Ministry of Housing and Urban-Rural Development and the National Development and Reform Commission have issued a document requiring local governments to organize research and formulation of plans for the upgrading and upgrading of urban gas pipelines in 2022. Su Jie, director of the Safety Coordination Department of the Ministry of Emergency Management, said that during the 14th Five-Year Plan period, the Ministry of Emergency Management will support and cooperate with the National Development and Reform Commission and the Ministry of Housing and Urban-Rural Development. 100,000 kilometers of old gas pipelines have been upgraded. New projects have been approved for four consecutive years. What are the prospects for nuclear power development?
< div> The National Development and Reform Commission and the National Energy Administration’s “14th Five-Year Plan for Modern Energy System Plan” proposed that by 2025, the operating installed capacity of nuclear power will reach about 70 million kilowatts. Since the National Standing Committee in April announced the approval of three new nuclear power plants in Shandong Haiyang. Since the launch of the unit project, the nuclear power "national team" has been raising funds frequently. On May 16, Fuqing Nuclear Power, a subsidiary of China National Nuclear Corporation, and Shandong Nuclear Power, a subsidiary of State Power Investment Corporation, announced a new round of fundraising plans.
my country has developed nuclear power for more than 30 years. After the Fukushima nuclear power accident in Japan in 2011, my country's approval of nuclear power was significantly tightened, and the entire nuclear power construction industry entered a trough. It was not until 2019 that my country's nuclear power projects began to be launched one after another. China's water conservancy construction investment is expected to accelerate this year. Over 800 billion yuan
It was learned from the Ministry of Water Resources that on May 16, the Wusong River Regulation Project (Jiangsu Section), a major national water conservancy project, started this year. Water conservancy projects, especially. The construction of major water conservancy projects has been vigorously promoted, giving full play to the important role of water conservancy in stabilizing investment and stabilizing growth. According to reports, China will ensure new developments this year.There are more than 30 major water conservancy projects, and it is estimated that more than 800 billion yuan will be invested in water conservancy construction.
The Ministry of Water Resources held a special scheduling consultation to promote the start of construction of major water conservancy projects in 2022, resolutely implement the requirements of "preventing the epidemic, stabilizing the economy, and ensuring safe development" and accelerate the advancement of major water conservancy projects. Water conservancy project construction started. At present, all work is progressing smoothly. The environmental impact assessment report of the Guangdong Water Resources Allocation Project around the Beibu Gulf with a total investment of 61.8 billion yuan was completed five months earlier than expected; the South-to-North Water Diversion Project with a total investment of 59.8 billion yuan has been completed. Land pre-examination (planning site selection) and other necessary requirements will be processed to lay the foundation for accelerating project approval.
More than half of the 1,000,000-kilowatt units of Baihetan Hydropower Station were put into operation
At 10:15 on May 30, Baihetan Hydropower Station Unit 5 successfully passed the 72-hour trial operation and was officially put into production. This is the eighth unit of the Baihetan Hydropower Station that has been put into operation, marking that more than half of the 16 million-kilowatt hydroelectric generator units of the Baihetan Hydropower Station have been put into operation. Up to now, the units in operation are operating stably, with excellent indicators, and have produced a total of more than 26.5 billion kilowatt-hours of clean electricity. The subsequent commissioning of the units is proceeding in an orderly manner.
After the Baihetan Hydropower Station is fully completed and put into operation, it will become the second largest hydropower station in the world after the Three Gorges Hydropower Station. At present, the Three Gorges Corporation has built 110 hydropower units on the main stream of the Yangtze River, and the world's largest clean energy corridor has been basically completed, with a total installed capacity of 71.695 million kilowatts, equivalent to the installed capacity of three Three Gorges power stations.
The inner dome of the first batch reactor of Hualong One was capped
At 15:56 on May 28, it lasted 18 Hours and 40 minutes later, China National Nuclear Corporation successfully completed the pouring of the inner containment dome of the reactor building of Hualong One Zhangzhou Nuclear Power Unit 1 on the 24th. The completion of this node marks the perfect end of the civil construction of the inner containment of Unit 1. The prestressed construction has met the prerequisites and laid a solid foundation for the realization of the scheduled total construction period of the project.
The dome structure of the inner containment vessel of Hualong One is complex. It is close to the steel lining and has a curved spherical shape. The maximum radius is about 24.5m, the maximum wall thickness is about 2m, and other wall thicknesses are about is 1m, the steel bar weight is about 819 tons, the embedded parts are about 515 pieces, the total concrete volume is about 4013m⊃3; the pouring volume is large; in the context of optimization of the construction period, coupled with the severe and complex epidemic situation, continuous high temperature, The rainy weather brings huge challenges to node completion.
The installation of the main body of the "Haiji No. 1" platform has been completed
It was reported on April 25 that Asia's first deepwater jacket platform independently designed and built by China—— The completion of the offshore installation of the main project of the "Haiji No. 1" platform marks the achievement of a high level of self-reliance and self-reliance in my country's deepwater ultra-large jacket platform equipment manufacturing and installation technology. It is of great strategic significance for improving energy self-sufficiency and ensuring national energy security.
The "Haiji No. 1" platform is a multi-functional drilling and production platform integrating drilling, production and life. It is equipped with a crude oil process system and the first set of produced water fine treatment and reinjection in the South China Sea. Systems and other equipment and facilities. The total height of the platform is 340.5 meters, which is higher than the Beijing International Trade Center. The deck area is 7,700 square meters, about 1.1 times the size of a standard football field. The total weight is nearly 40,000 tons. Once completed, it will set a new weight record for my country's offshore single crude oil production platform. . In order to reduce operational risks, improve construction efficiency, and reduce offshore construction operations, the "Haiji No. 1" platform adopts an integrated construction method. The land construction integration rate reaches 93%, and all key equipment is domestically produced.
The vault hoisting of the world’s largest cryogenic storage tank for the largest liquefied natural gas reserve project in China was completed
Recently, China National Chemical Corporation The Jiangsu Binhai LNG receiving terminal project, the largest domestic liquefied natural gas reserve project undertaken by Fourteenth Company, was reported by the CCTV13 news live broadcast room. The program showed in detail the grand hoisting of the world's largest 270,000 cubic meter cryogenic storage tank from the vault, conveying The public’s expectations for the construction of Yancheng Green Energy Port and the development of clean energy industry.
The Jiangsu Binhai LNG receiving station project is a key planning project for the construction of the national natural gas production, supply, storage and marketing system and interconnection. A total of 10 large-scale liquefied natural gas storage tanks have been built, including 4 of 220,000 cubic meters. m storage tanks and six 270,000 cubic meter storage tanks. Its 270,000 cubic meter full-capacity storage tank is the largest LNG storage tank currently built in the world.
The world’s largest coal-fired power plant carbon capture project was launched
Recently, China Energy Construction Northwest Institute won the bid for Huaneng Long East base 1.5 million tons/year advanced low-energy carbon capture engineering survey and design project. After the project is completed, it will become the world's largest coal-fired power plant carbon capture project. It is currently the largest domestically owned Guohua Jinjie Power Plant with a capacity of 150,000 tons./year carbon dioxide capture project is ten times the carbon dioxide capture scale. The project is located at Huaneng Longdong Energy Base in Qingyang, Gansu Province. Relying on this base, the 2×1000 MW project of Zhengning Power Plant has a carbon dioxide capture capacity of 1.5 million tons per year.
The project adopts a post-combustion chemical absorption capture process route. The carbon dioxide capture rate is not less than 90%, and the purity of the finished product is not less than 99.5%. All the captured carbon dioxide will be used for Oil displacement and storage. This project is planned to be designed, constructed and put into operation simultaneously with the Zhengning Power Plant project. The planned start-up time is December 2023.
The first deep-sea floating wind power equipment in China has been assembled.
On May 27, China Shipbuilding Industry Corporation "Fuyao", China's first deep-sea floating wind power equipment designed and manufactured under the leadership of China Marine Wind Power Co., Ltd. (hereinafter referred to as China Marine Engineering), completed its final assembly in Maoming, Guangdong and held a towage ceremony. According to reports, more than 90% of the main components of "Fuyao" are completed domestically, laying the foundation for the future large-scale development of floating wind power in my country.
The floating platform of "Fuyao" has a total length of 72 meters, a molded depth of 33 meters, and a molded width of 80 meters. It is equipped with a China Marine 6.2-MW typhoon-resistant Class I wind turbine unit. The tower height is 78 meters, the hub center height is 96 meters, the rotor diameter is 152 meters, the blade length is 74 meters, and the total weight of the floating body and unit exceeds 4,000 tons.
The six world’s largest LNG storage tanks in the “Green Energy Port” completed the hoisting of the vault modules
May 17 , six liquefied natural gas storage tanks with the world's largest single tank capacity of 270,000 cubic meters independently designed and built by my country have all completed the hoisting of vault modules at the "Green Energy Port" of CNOOC Yancheng. Six storage tanks were hoisted at one time, making it the largest in the country.
The first phase of the CNOOC Yancheng “Green Energy Port” project built a total of 10 large-scale liquefied natural gas storage tanks, including 4 220,000-square-meter storage tanks and 6 270,000-square-meter storage tanks. It is expected that after it is fully put into operation by the end of 2023, the annual processing capacity of liquefied natural gas will reach 6 million tons, equivalent to 8.5 billion cubic meters of gaseous natural gas, which can provide gas for people's livelihood in Jiangsu Province for about 28 months.
MeChina's first single million-kilowatt onshore wind power base was put into operation
On June 29, China General Nuclear Power Group (referred to as CGN) Inner Mongolia Xing'an League 3 million kilowatt wind power project The first phase of 1 million kilowatts of grid-connected power generation marks the formal commissioning of my country's first single million-kilowatt onshore wind power base.
The Xing'an League Economic and Technological Development Zone Wind Power Equipment Manufacturing Innovation Demonstration Industrial Park, which is built to support the wind power base, combines the world's advanced clean energy technology, high-end equipment technology, digital information technology and smart energy technology with The integration of Xing'an League Clean Energy Base has built a development and operation model for the entire clean energy industry chain, forming a large pattern of industrial assistance. The industrial park has the research and development, production, repair and maintenance capabilities of tens of millions of kilowatt-level wind power equipment. It is of great significance for improving the industrial structure of Xing'an League, accelerating the rise of the modern equipment manufacturing industry, and promoting strategic energy structure adjustment and the development of new energy industries. .
Gansu Province’s first medium- and long-distance hydrogen transmission pipeline started construction in Yumen Oilfield
On the morning of April 22 , the Yumen Oilfield Hydrogen Pipeline Project Groundbreaking Ceremony was held at the Hydrogenation Station of the Oilfield Refinery and Chemical Plant, marking the official start of construction of the first medium- and long-distance pure hydrogen pipeline in Gansu Province.
The project plans to build a new hydrogen transmission pipeline with a diameter of 200 mm, a length of 5.77 kilometers, a hydrogen transmission capacity of 10,000 standard cubic meters per hour, and a pressure of 2.5 MPa, connecting the Yumen Refinery for hydrogen filling. stand. The project is expected to be completed and put into operation by the end of June. It will then become the first medium- and long-distance pure hydrogen pipeline in Gansu Province, which can further meet the hydrogen demand of Yumen Refinery and enterprises surrounding the old urban area of ​​Yumen, and will be instrumental in accelerating the creation of "hydrogen energy" in Gansu Province. It is of great significance to become the main enterprise of the industrial chain chain" and to build PetroChina's "Yumen Clean Transformation Demonstration Base".
The construction of the first million-level clean energy base project in Northern Xinjiang was officially launched
On April 19, CNNC The unveiling of Xinhua (Burqin) Pumped Storage Power Generation Co., Ltd. of the Group was held in Burqin County, Xinjiang, marking the beginning of the construction of a large multi-energy complementary energy base in Burqin, Xinjiang. The Burqin pumped storage project is a key implementation project of the "14th Five-Year Plan" of the country's "Pumped Storage Medium and Long-term Development Plan (2021-2035)". It is CNNC's first "water, wind, and water" project built around a pumped storage power station. "Optical and storage" integrated large base project.
The projectIt is the first million-level clean energy base project in northern Xinjiang. Based on the recently won Burqin pumped hydro energy storage project with an installed capacity of 1.4 million kilowatts, the local government will follow up the construction of Burqin with a supporting ratio of 1:4. The integrated water, wind, solar and storage project in the river basin includes 2 million kilowatts of photovoltaics and 3.6 million kilowatts of wind power. At present, the construction of the first phase of the 150,000 wind power supporting project has officially started. The total planned installed capacity of the project is expected to be 7 million kilowatts.
The first unit of the third-generation domestic aromatics technology was completed and put into operation
On June 8, from the Sinopec News Office It was learned that Jiujiang Petrochemical’s 890,000 tons/year aromatics complex, the first industrial application device of Sinopec’s third-generation aromatics technology, was successfully started up and produced qualified products. This project is a key project in the national industrial layout. The successful start-up marks that my country's aromatics complete technology has reached the international leading level. It has significantly improved my country's aromatics production technology level and international competitiveness, and will lay the foundation for the local industry to build an industrial cluster worth over 100 billion yuan.
The device uses the third-generation aromatics technology with independent intellectual property rights of Sinopec, which has the advantages of low investment cost, low energy consumption and high catalyst application efficiency. This technology is the first to develop and apply a complete set of single-tower adsorption and separation technology, changing the past two-tower adsorption into single-tower adsorption. The adsorbent utilization rate is increased by 10%, the investment cost is reduced by nearly 20%, and the operation is more stable. At the same time, through energy integration and comprehensive optimization and utilization such as optimization of the entire process of the aromatics combined unit, integrated heat combination, and efficient utilization of low-temperature heat, the energy consumption of the unit is less than 220 kg of standard oil/ton of PX, which is 30% lower than similar aromatics units. Reach the international leading level.
The largest single-process refining and chemical integration project in China was officially put into operation
On May 16, Shenghong 16 million The first batch of core main units of the ton/year integrated refining and chemical project were successfully put into operation in Xuwei New District, Lianyungang, Jiangsu Province, marking the official start-up of the largest single-process integrated refining and chemical project in China.
The Shenghong refining and chemical integration project has a total investment of approximately 67.7 billion yuan, with an annual crude oil processing capacity of 16 million tons. It is Lianyungang’s diversified project in new energy, new materials, electronic chemistry, and green environmental protection. The core raw material platform of the new "1+N" pattern of the industrial chain is also a key core project to integrate the entire industrial chain and create a world-class new energy and new materials industry cluster. After the project is put into operation, it will make up for the domestic supply rate of high value-added and in-demand chemical products such as olefins and aromatics, and achieve the mutual supply of more than 80% of raw materials and products in Lianyungang Petrochemical Industry Base.
my country’s first offshore large-scale carbon dioxide capture, utilization and storage cluster research project launched
June 28, China CNOOC announced that it has cooperated with the Guangdong Provincial Development and Reform Commission, Shell (China) Co., Ltd. and ExxonMobil (China) Investment Co., Ltd. to establish an "online + offline" network in Beijing, Guangzhou, London, the United Kingdom, and Houston, the United States. "formally signed a Memorandum of Understanding on the Daya Bay Area Carbon Dioxide Capture, Utilization and Storage ("CCS/CCUS") Cluster Research Project, marking the official launch of my country's first offshore large-scale (3 to 10 million tons) CCS/CCUS cluster research project. start up.
According to the plan, the Daya Bay Area offshore large-scale CCS/CCUS cluster research project will focus on comprehensively solving the carbon emission reduction problem in the Daya Bay Area and help Huizhou build a world-class green petrochemical industry highland.
Jinling Petrochemical CCUS project system supporting projects entered the implementation stage
On May 5, Jinling Petrochemical CCUS (carbon dioxide capture Collection, utilization and storage) project system supporting project start-up report was approved, marking that the project has officially entered the implementation stage. At present, the main equipment of the project has entered the detailed design stage, compressors and other large equipment have entered the long-term procurement process, and the construction of related system supporting projects has begun.
In June 2021, the company signed contracts with three companies including Jiangsu Oilfield to start cooperation on carbon dioxide recycling projects, and plans to build a new 100,000-ton/year CCUS device. This device uses carbon dioxide gas generated during the refining and chemical production process as raw material. Through processes such as recovery, compression, purification, liquefaction, and purification, it removes moisture from the carbon dioxide raw gas and obtains high-purity liquid carbon dioxide products, which can be used as carbon dioxide flooding for petroleum exploration companies. High-quality raw materials for the process, this can effectively reduce the carbon dioxide content in the atmosphere and achieve "turning waste into treasure".
Long-distance pipeline gasified coal slurry dehydration and concentration technology realizes industrial application
16:00 on June 2 , following the instruction to "turn on the slurry pump and transport slurry to Shaanxi Chemical Company", 130.57 cubic meters of high-concentration coal-water slurry was transported from Huaxian Station to Shaanxi Shaanxi Coal Chemical Group Co., Ltd. through a more than 800-meter-long straight pipeline. Gasification large coal slurry tank. At 17:48, the good news came again, taken from the end user sideThe sample test results show that the product concentration, viscosity and other indicators meet the requirements. This marks the successful delivery of the first batch of high-concentration gasified coal-water slurry at the Huaxian Station of the China Coal Science and Technology Shenwei Coal Pipeline and the realization of industrial application.
The Shenwei Pipeline Coal Transportation Project is my country’s first long-distance pipeline coal transportation project. China Coal Wuhan Design Institute serves as the EPC general contractor. Coal Clean Energy uses its unique water-coal The patented technology and proprietary equipment for pulp thickening provide a complete process package for its terminal dehydration and thickening, and lead system joint debugging as the PC contractor of the project construction.
my country’s first domestically produced deepwater subsea tree was officially put into use
China National Offshore Oil Corporation in June It was announced on the 14th that with the successful completion of the undersea gas well blowout test operation in Yinggehai, South China Sea, my country's first set of domestically produced deepwater subsea trees was officially put into use, marking that my country has the design, construction and production of complete sets of deepwater subsea tree equipment. Application capabilities.
The underwater Christmas tree is the core component of the offshore oil and gas underwater production system and the basis for constructing the underwater oil and gas well production string. The equipment weighs 55 tons and consists of more than 2,500 It is composed of parts and components and has the functions of safely isolating the oil reservoir and ensuring the safety of underground operations. For a long time, only five European and American companies in the world have mastered the design and construction technology of underwater production systems, resulting in long procurement cycles, high prices, and difficult maintenance of this equipment. The commissioning of this underwater oil and gas production system engineering demonstration application project further verified the safety and reliability of the domestic equipment, marking a key step in the development of key technical equipment for my country's deepwater oil and gas development.
Construction of the second phase of Zhejiang Sanmen Nuclear Power Plant started
On June 28, China Nuclear Power Sanmen, a subsidiary of CNNC, The first container of concrete was poured into the nuclear island reactor of Nuclear Power Unit 3, marking the official start of the second phase of Zhejiang Sanmen Nuclear Power Project, a major national energy project. It is reported that the second phase of the project will build two million-kilowatt nuclear power units using CAP1000 technology. The installed capacity of a single unit is 1.251 million kilowatts. The design life of the unit is 60 years. After completion, the annual power generation can reach 20 billion kWh, equivalent to Reducing carbon dioxide emissions by 15 million tons per year will effectively promote the optimization of the industrial structure and energy structure of Zhejiang Province and ensure the security of the East China power grid and regional energy supply.
The State Council executive meeting held on April 20 this year approved three new nuclear power unit projects in Sanmen, Zhejiang, Haiyang, Shandong, and Lufeng, Guangdong. Specifically, Zhejiang Sanmen Nuclear Power Phase II and Shandong Haiyang Nuclear Power Phase II projects both use localized CAP1000 technology., Guangdong Lufeng Nuclear Power Project adopts Hualong One technology. Both technologies are third-generation pressurized water reactor nuclear power technologies.
The electromechanical equipment installation project of Ninghai Pumped Storage Power Station in Zhejiang has officially started
Recently, the Gezhouba Mechanical and Electrical Equipment Company of China Energy Construction Co., Ltd. The electromechanical equipment installation project of Zhejiang Ninghai Pumped Storage Power Station received a start order and officially started.
Ninghai Pumped Storage Power Station is located in Dajiahe Town, Ninghai County, Zhejiang Province. It has a total installed capacity of 1,400 MW and a total of four 350 MW reversible hydroelectric generator units installed. The power station is a daily regulated pure pumped storage power station. It is mainly responsible for the peak shaving, valley filling, frequency modulation, phase modulation and emergency backup tasks of the Zhejiang power grid. After the power station is completed, it will improve the peak shaving capacity of the Zhejiang power system and further improve the power supply of the power grid. quality and maintain the safe, economical and stable operation of the power grid.
The highest rated water head in the world! Zhejiang Tiantai Pumped Storage Power Station officially started construction
The Tiantai Pumped Storage Power Station project is a key focus of the 14th Five-Year Plan of the country's "Pumped Storage Medium and Long-term Development Plan (2021-2035)" Implementation projects, major construction projects planned during the 14th Five-Year Plan of Zhejiang Province, are also major projects for Tiantai County to integrate into the Yangtze River Delta integrated development strategy and construction.
The power station is located in Tiantai County, Zhejiang Province, with an installed capacity of 1,700 megawatts. The rated water head of the power station is 724 meters, the highest in the world. The single unit capacity of 425,000 kilowatts ranks first in the country. The length of the upper and lower water diversion inclined shafts is 483.4 No. 1 in China, the project construction difficulty is at the forefront of the country. Many records will be set during the construction process, pushing the construction level of pumped storage power stations to new heights in the world. The main buildings of the hub project are composed of upper reservoir, lower reservoir, water transmission system, underground factory building and switch station.
The central Yunnan water diversion project has achieved more than half of the investment and construction
As of late May, the central Yunnan water diversion project has been completed Both investment and construction progress have exceeded half: the cumulative excavation (tunneling) is 438.0 kilometers, accounting for 58.0% of the total construction mileage of 755 kilometers; the cumulative investment in the first phase of the project is 44.84 billion yuan, accounting for 54.3% of the dynamic total investment of 82.576 billion yuan. At present, the construction of the water diversion project in central Yunnan is being vigorously promoted, with an investment of 4.293 billion yuan completed in 2022, giving full play to the important role of water conservancy in stabilizing investment and stabilizing growth.
The central Yunnan water diversion project is one of the 172 projects required by the State Council to accelerate its construction.One of the major water conservancy projects, it mainly focuses on urban domestic and industrial water supply, and also takes into account agricultural and ecological water. The water supply scope covers six Yunnan provinces and cities: Lijiang, Dali, Chuxiong, Kunming, Yuxi, and Honghe. After completion, it can effectively alleviate the problems in central Yunnan. The contradiction between urban production and living water use over a long period of time will be improved, and agricultural production conditions and the ecological and water environment conditions of rivers and lakes in the region will be improved.
my country’s first large-scale industrial trial production of bio-jet fuel
On June 28, China’s first set of bio-jet fuel The industrial device produced bio-jet fuel for the first time at Sinopec Zhenhai Refinery, which means that my country's bio-jet fuel can achieve large-scale production and has taken a solid step towards large-scale production and commercial application.
Compared with traditional petroleum-based aviation kerosene, bio-jet fuel can reduce carbon dioxide emissions by up to 50% in its entire life cycle. The device has an annual design processing capacity of 100,000 tons and can basically Digesting the waste oil recycled in a city with a population of 10 million can reduce carbon dioxide emissions by about 80,000 tons per year, which is equivalent to stopping nearly 50,000 economical cars for a year.
China’s Bohai billion-ton oil field block achieved capping 20 days ahead of schedule
On June 28, from China Offshore Oil Tianjin Branch was informed that the last deck piece of the WHPB (wellhead platform) module in Block 5-1/5-2/6-1 of Kenli 6-1 Oilfield was successfully completed and in place at the Tanggu site of Offshore Oil Engineering, marking The main structure of the block was successfully capped.
Kenli 6-1 Oilfield is the largest crude oil production increase project under construction in Bohai Oilfield, China's largest crude oil production base, in 2022. It is composed of Block 4-1 of Kenli 6-1 Oilfield, Composed of three development projects, Block 5-1/5-2/6-1 and Block 10-1 North, the proven geological reserves of oil exceed 100 million tons, which is the first 100 million tons discovered by exploration in the northern area of ​​Laizhou Bay, Bohai Sea, China. It is a large-scale oil field that can accommodate 1 million vehicles for more than 20 years after it is completed and put into operation. It is of great significance to ensuring energy supply in the Beijing-Tianjin-Hebei region and national energy security.
The construction of "Deep Sea No. 2" is about to start
On June 25, it was located in Lingshui waters in the southeastern part of Hainan Island On the "Deep Sea No. 1" energy station, the platform torch was slowly lit. The offshore ultra-deep water gas field with the deepest average water depth and the most difficult exploration and development discovered so far in our country was successfully put into production, marking the realization of China's offshore oil industry from 300 meters to A historic crossing of 1,500 meters of ultra-deep water.
CNOOC has simultaneously promoted the development of deep-sea oil and gas development equipment and the construction of talent echelons, and has basically formed a training and selection mechanism for deep-sea oil and gas development talents. At present, the "Shenhai No. 2" project team has been formed with the construction and operation technical personnel of the "Shenhai No. 1" large gas field as the backbone to accelerate the construction of my country's first deepwater high-temperature and high-pressure gas field "Shenhai No. 2" (Lingshui 25-1) work to achieve efficient and continued development of deep sea oil and gas resources. The new projects will be fully integrated into the existing natural gas supply system, further expanding the scale of deepwater natural gas production and improving my country's energy self-sufficiency rate.
The largest nuclear power plant in operation in China will “warm” the surrounding area
On June 23, with the 168-hour trial operation The test was successfully completed, and Unit 6 of Liaoning Hongyanhe Nuclear Power Plant is ready for commercial operation. This also marks that the Hongyanhe Nuclear Power Plant, the first nuclear power plant in Northeast China and the largest electric energy investment project in Northeast China, has a total of 6 units in full operation. , and became the nuclear power plant with the largest installed capacity in operation in China.
While providing clean electricity safely and stably, Hongyanhe Nuclear Power Plant continues to expand the boundaries of nuclear energy application and actively promotes nuclear energy heating projects in surrounding communities. On March 9, 2022, Hongyanhe Nuclear Power Plant and State Power Investment Corporation Northeast Electric Power Co., Ltd. signed the "Cooperation Agreement on Construction, Operation and Maintenance of Nuclear Energy Heating Demonstration Project". The first nuclear energy heating project in Northeast my country has entered a substantial advancement stage. On April 6, 2022, the nuclear energy heating project officially started. It is planned to realize heating of the surrounding Hongyanhe Town during this winter heating period. The heating area is planned and designed in advance to be 242,400 square meters.
The second phase of the Wen 23 gas storage project started construction
On June 23, the national oil and gas infrastructure key Project - The second phase of the Wen 23 gas storage project has officially started construction. After the completion of this project, the overall gas storage capacity of Wen 23 gas storage can be increased by 20%, which is of great significance to further improving the gas storage peak shaving and emergency support capabilities of my country's natural gas pipeline network.
The second phase of the construction project plans to drill 24 new injection and production wells, expand the existing injection and production stations, add gas injection compressor units, and construct 4 cluster well sites. And injection and gas collection and transmission trunk line projects. After the completion of the second phase of the project, it will have an additional storage capacity of 1.934 billion cubic meters and a working gas capacity of 735 million cubic meters, achieving a total gas injection scale of 24 million cubic meters per day and a gas production capacity of 24 million cubic meters per day.The construction target of gas capacity of 39 million cubic meters per day has greatly improved the gas storage and peak-shaving capacity of Wen 23 gas storage.
The construction of my country’s first offshore carbon dioxide storage demonstration project equipment was completed
On June 15, after nearly 10 months R&D and manufacturing, the construction of my country's first offshore carbon dioxide storage demonstration project equipment has been completed.
CNOOC has worked with domestic manufacturers to focus on key issues and achieved full localization of key offshore carbon dioxide storage equipment. The project adopts the unique modular and skid layout of offshore platforms, and applies cutting-edge technologies such as phase control, pulse control, and joint vibration analysis to develop the first set of supercritical macromolecular compressors and the first set of supercritical macromolecular compressors suitable for marine high-humidity and high-salt environments. A set of composite carbon dioxide molecular sieve dehydration skids has formed an engineering technology system, complete equipment and management experience for offshore carbon dioxide capture, reinjection and storage.
my country’s first “dual-band 5G + industrial Internet” smart refinery was fully completed and put into operation
June 21 , my country's first "dual-band 5G + industrial Internet" smart refinery construction project was completed and put into operation at the CNOOC Huizhou Petrochemical Refinery affiliated to China National Offshore Oil Corporation. CNOOC has realized the update and iteration of traditional refinery production methods through digital technology, and established a new intelligent and digital refinery in the Guangdong-Hong Kong-Macao Greater Bay Area.
With the support of dual-band 5G private network, digital technologies such as the Internet of Things and artificial intelligence are deeply integrated with production operations and safety management, building an intelligent refining system based on "dual-band 5G + industrial Internet" factory. CNOOC’s smart refinery consists of 8 smart weapons and 1 ecology, including 5G explosion-proof intelligent inspection robots, 5G+AR remote collaboration, 5G operation AI monitoring, and digital application crowd-creation ecology. It is the most important petrochemical industry in the Guangdong-Hong Kong-Macao Greater Bay Area. The stable operation of the product supply base is guaranteed.
The first batch of national large-scale wind power and photovoltaic base projects, Labashan Wind Power Project, officially started construction
On June 7, located in Sichuan The Laba Mountain Wind Power Project in Dechang County, Liangshan Prefecture, has officially started construction. This is the first batch of large-scale wind power and photovoltaic base projects in the country, and it is also a landmark project of the water, wind and solar complementary green clean renewable energy demonstration base in the Yalong River Basin.
The Labashan Wind Power Project has an installed capacity of 192,000 kilowatts and plans to build 60 wind turbines.Group, wind turbines are distributed in the northern section, middle section and west side of the main ridge of Laba Mountain along the branches extending from the Yalong River Valley. The Labashan Wind Power Project plans to hoist the first unit in October 2022, and all units will be put into production in September 2023.
Offshore wind power is expected to ride the wind and waves
On June 6, the Development and Reform Commission of Guangxi Zhuang Autonomous Region issued the "Renewable Energy Development in Guangxi" The "14th Five-Year Plan" proposes that during the "14th Five-Year Plan" period, Guangxi will strive to approve the start-up of offshore wind power installed capacity of not less than 7.5 million kilowatts, of which the grid-connected installed capacity will not be less than 3 million kilowatts. Less than a week ago, the portal website of the Fujian Provincial People's Government also released the "Special Plan for Energy Development of Fujian Province during the 14th Five-Year Plan". During the "14th Five-Year Plan" period, an additional 4.1 million kilowatts of offshore wind power grid-connected installed capacity will be added, and new provincial-controlled sea areas will be developed. The scale of offshore wind power is approximately 10.3 million kilowatts.
As of June this year, the "14th Five-Year Plan" offshore wind power development plans for coastal provinces such as Fujian, Guangdong, Zhejiang, and Guangxi have been released. Rough statistics show that the offshore wind power development goals of each coastal province have exceeded It has reached 50 million kilowatts, which also means that my country’s offshore wind power is entering the fast lane.
The "thousand-ton well" was discovered in the Shunbei Oil and Gas Field in the Tarim Basin
On June 15, Sinopec Northwest Oilfield deployed Well Shunbei 802X, a key exploration well in the Shunbei Oil and Gas Field in the Tarim Basin, recently tested and obtained high-yield industrial oil and gas flow, which is equivalent to a daily production of 226.7 tons of crude oil, 1.257 million cubic meters of natural gas, and an oil and gas equivalent of 1,228 tons. This is the third "kiloton well" discovered by Sinopec in the Shunbei No. 8 fault zone in the past year, showing good exploration prospects.
The No. 8 fault zone where Well Shunbei 802X is located generally contains oil and gas, and has good resource prospects. There are 18 main fault zones in the Shunbei Oil and Gas Field. Well Shunbei 802X is located in the middle section of the No. 8 fault zone, with a drilling depth of 8,396 meters. Previously, Sinopec had discovered two "thousand-ton wells" in the area, Shunbei 8X Well and Shunbei 801X Well. The breakthrough of Well 802X further demonstrates the good exploration prospects of oil and gas in the Shunbei No. 8 fault zone as a whole.
Sinopec launches Zhujiadun gas storage construction project
On April 12, Sinopec Jiangsu Oilfield launched the Zhujiadun gas storage construction project. The project has a designed storage capacity of 662 million cubic meters and a working gas volume of 330 million cubic meters. It is expected that after it is put into operation, the maximum daily peak shaving capacity can reach 410 10,000 cubic meters, which can meet the gas demand of 8.2 million households every day. It will further enhance the natural gas seasonal peak shaving and emergency reserve capabilities in the Yangtze River Delta region and ensure the gas supply demand in the region.
The Zhujiadun gas storage is located in Yandong Town, Tinghu District, Yancheng City, Jiangsu Province. The main project is based on the Zhujiadun gas reservoir of the Jiangsu Oilfield. It has been demonstrated that the Zhujiadun gas reservoir covers The layers and faults have good sealing properties and have favorable conditions for building underground gas storage.
CNOOC took the lead in signing the largest liquefied natural gas ship construction project in China
On April 28, CNOOC It took the lead in signing six liquefied natural gas (LNG) carrier construction project contracts through "cloud signing". In addition to the 6 construction contracts signed in early January this year, the construction of 12 LNG carriers will begin, with a construction value of approximately 16 billion yuan. It is the largest LNG ship construction project with the largest investment in China, and will effectively enhance my country's LNG transportation industry chain. autonomous ability.
It is reported that the 12 new ships will adopt the latest fifth-generation LNG ship model independently developed by Hudong-Zhonghua Shipyard and jointly optimized with CNOOC, using the world's most advanced main engine system and the latest Cargo hold technology can significantly reduce ship fuel consumption and reduce resource transportation costs. Carbon emissions are 15 years ahead of the requirements set by the International Maritime Organization (IMO). Other emission indicators can meet the most stringent international standards, ship performance, and environmental protection indicators. , the technical level is at the international leading level.
Sinopec and BASF launch Nanjing integrated base expansion project
April 28 On September 1, Sinopec and BASF laid the foundation stone for the Nanjing integrated production base expansion project. The integrated base is operated by Yangzi Petrochemical-BASF Co., Ltd. jointly funded by both parties.
The two parties stated that they will use global advanced technology to build the expansion project. The expansion project includes the construction of a new tert-butyl acrylate (TBA) unit and the expansion of multiple downstream chemical units. This round of expansion and new equipment will be put into operation at the end of 2023. Once put into operation, it will better meet the demand for special chemicals in the domestic market and promote the rapid development of the domestic high-end new materials industry.
The total investment is 42.07 billion yuan! China-Saudi Arabia Gulei Ethylene Project Was Approved
Recently, Fujian Gulei 1.5 million tons/year ethylene and downstream deep processing complex project with a total investment of 42.07 billion yuan - China-Saudi Arabia The Gulei Ethylene Project has been officially approved by the Fujian Provincial Development and Reform Commission, marking the official launch of the largest one-time investment Sino-foreign joint venture project in Fujian Province to date in Zhangzhou Gulei Development Zone, and will accelerate the start of construction and implementation.
As the third batch of national major foreign investment special projects and the second round of national key projects for China-Saudi Arabia production capacity and investment cooperation, this project is jointly funded by Saudi Basic Industries Corporation (SABIC) and Fujian Energy and Chemical Group It is a joint venture with Zhangzhou Jiulongjiang Group. It will invest in, build and operate a world-class large-scale petrochemical complex at the Gulei Petrochemical Base, build a set of ethylene units with an annual output of 1.5 million tons, and also build a series of supporting downstream production units, using a number of Global advanced technology, many patented technologies are adopted for the first time in China, filling the domestic gaps.
China Power Construction Group plans to raise 15 billion yuan in additional capital for both traditional infrastructure and new energy projects
May 20 In the evening, China Power Construction (601669) disclosed a private placement plan. The company plans to raise 15 billion yuan in funds to invest in three major categories of projects, while supplementing working capital and repaying bank loans. Among them, the three major categories of projects are quality engineering contracting projects, investment and operation projects in strategic development areas, and offshore wind power survey and construction business equipment procurement projects. The proposed raised funds are 5.5 billion yuan, 4 billion yuan, and 1 billion yuan respectively. yuan, with the remaining 4.5 billion yuan used to supplement working capital.
In 2022, China Power Construction plans to start construction of new energy installed capacity of more than 10 million kilowatts, and plans to approve 4 pumped hydro energy storage projects with a total installed capacity of approximately 5 million kilowatts. Investment in the new energy field The planning is 48.332 billion yuan.
The 11 projects started (pre-started) by China Energy Group account for about 60% of the installed capacity of clean renewable energy
On May 18, the National Energy Group held a centralized start (pre-start) ceremony for power supply projects in 2022, announcing 11 projects in 5 categories, including onshore new energy bases, offshore wind power, large hydropower, coal power expansion and upgrades, and natural gas power generation, with a total installed capacity of 1,238 The construction and pre-construction of tens of thousands of kilowatts of power projects have started.
The 11 projects have a total investment of 86.1 billion yuan. After completion, it is expected to increase the power supply every year.Should be 48.5 billion kilowatt hours. The projects are distributed in 10 provinces and regions, involving 9 subsidiaries of the National Energy Group, of which clean renewable energy accounts for about 60% of the installed capacity.
National Energy Group’s 2×400 MW natural gas power generation project was registered
On May 16, National Energy The Sanya East Natural Gas Power Generation Project of Hainan Company of the Group was registered. This project is the last gas-fired power generation project in Hainan Province’s “14th Five-Year Plan”, with a total investment of approximately 2.5 billion yuan. It is planned to build a 2×400-megawatt gas-steam combined cycle
< strong> Xinjiang Energy Group signed a contract for coal chemical project in Santang Lake Mining Area in Hami
On May 31, Xinjiang Energy Group signed a contract with Aerospace Investment Holding Co., Ltd. and Aerospace Changzheng Chemical Engineering Co., Ltd. The company held a strategic cooperation framework agreement signing ceremony
The Santang Lake Mining Area Coal Chemical Project is one of the key projects of Xinjiang Energy Group’s “14th Five-Year Plan” with an estimated investment of 50 billion yuan. The Shitou Mei No. 1 open-pit coal mine of Xinjiang Energy Group is the only coal mine that has been completed and put into operation in the Santanghu mining area. It has an approved production capacity of 15 million tons per year. The coal quality has the characteristics of low ash content, high calorific value, and low content of harmful elements. It can be used as coal Chemical projects provide high-quality and sufficient coal source guarantee.
Sinopec’s annual 250,000-ton green elastomer project officially started construction
On June 16, Sinopec The 250,000 tons/year thermoplastic elastomer project has started construction. The main unit of the project is Shanghai Jinshan Baling New Materials Co., Ltd., a joint venture registered by Sinopec Shanghai Petrochemical and Baling Petrochemical.
This project is one of Shanghai’s major industrial projects in 2022, with a planned total investment of 3.27 billion yuan. It is expected to be completed and put into operation in the second half of 2023. It will fill the gap of Sinopec in East China that does not have this device. Blank, further promote the intensive and high-end development of my country's new materials industry, cultivate new advantages in the development of new materials industry, and build a new strategic pivot for the future development of the Yangtze River Delta region.
Huaneng & Shandong Weihai strategically signed a contract to invest 18 billion in offshore wind power and other projects during the 14th Five-Year Plan
In Weihai Marine Industry Cooperation Desert held on June 20At the dragon event, Weihai City and Huaneng Shandong Power Generation Co., Ltd. signed a strategic cooperation agreement. During the "14th Five-Year Plan" period, Huaneng Shandong Power Generation Co., Ltd. will invest 18 billion yuan to cooperate with Weihai City on a series of new energy projects such as offshore wind power, which will bring cleaner "green energy" to Weihai's development.
In the centralized signing process, 11 projects including Rushan large-megawatt offshore wind power equipment manufacturing base project, offshore cable production base project, Shanghai Polytechnic Institute wind power supporting project, and Sinotrans Logistics Industrial Park project Projects are collectively signed, involving fields such as new energy, new materials, rural revitalization, warehousing and logistics, textiles and clothing, and food intensive processing.
15.7 billion, Tongkun Co., Ltd. launched ethylene glycol and other two chemical projects
On the evening of May 30, Tongkun Co., Ltd. Kunming Chemical Co., Ltd. announced that it plans to launch two chemical projects. As a large private refining and chemical enterprise, the company's investment and construction projects cover ethylene glycol in the upstream of the industrial chain and chemical fiber products in the downstream, which will further enrich the company's industrial chain.
Among them, Tongkun Co., Ltd. plans to invest 9.942 billion yuan to build a natural gas-to-ethylene glycol project, and plans to invest 5.765 billion yuan to build a lightweight, comfortable and functional differentiated fiber project. The total planned investment in the two chemical projects is approximately 15.7 billion yuan. The project construction period is 3 years.
West China Energy signed a contract with Laos Nampan 660MW clean energy project
West China Energy Company and Laos Pensa Eastern Electric Power Co., Ltd. The "Offshore Supply Contract for Laos Namphan Clean Energy Project" and the "Laos Nampan Clean Energy Project Landed Service Contract" were signed via video link, with a total contract value of approximately 2.758 billion yuan.
The Laos Namphan 660MW clean energy project signed by both parties was invested and developed by Laos Pensa Company. The company is responsible for the design, equipment supply, installation and commissioning of the project. The project is located in Xieng Khouang Province, Laos, with a total contract value of approximately 2.758 billion yuan and an installed capacity of 660MW. The project is scheduled to be completed in 45 months. After completion, the annual grid-connected power will reach 3861 GWh. The two parties of the project have achieved today's hard-won cooperation results through nearly two years of hard work and nearly a hundred technical and commercial communications.
SINOMACH signed a contract for the Indonesian hydrometallurgical zinc smelting plant project
Recently, SINOMACH signed a contract with Indonesia to produce an annual output of 4 10,000 tons hydro-process zinc smelting plant project. After the project is completed, it will becomeAn important zinc smelter in Indonesia will help it increase the use of zinc products in the country.
The main content of the project is the construction of a hydrometallurgical zinc smelting plant with an annual output of 40,000 tons, including a roasting workshop, a leaching workshop, a purification cadmium recovery workshop, an electrolysis workshop and other auxiliary facilities. China Heavy Machinery Co., Ltd., a subsidiary of the group, is responsible for equipment procurement, installation, anti-corrosion and construction in the project.
General Technology International signed a US$466 million Algerian energy and chemical project
On May 19, local time, General Technology The CNTIC-Sinopec Luoyang Engineering Co., Ltd. consortium and the National Petroleum Company of Algeria officially signed an EPC general contracting contract for the MTBE project, with a total amount of approximately US$466 million. This signing comes less than a month after CNTIC signed the EPC general contract for the Algerian boiler project on April 30.
The project is located in Oran, the largest city and industrial and commercial center in western Algeria. The work includes the design, procurement and construction of MTBE (methyl tert-butyl ether) combined equipment and supporting facilities. , installation, commissioning, trial operation and technical support and warranty during one year of operation.
Original title: General Machinery Industry Policy and Market Trends (Second Quarter of 2022)
lable:

Quick Links
Xiamen Middia Biological Ceramic Technology Co.,Ltd
Xiamen Middia Biological Ceramic Technology Co.,Ltd
address
address:Room 305, No. 891 Fanghubei 2nd Road, Huli District, Xiamen City, Fujian Province, China
Contact Us
  • Telephone:86-15396283716
  • E-mail:1617844001@qq.com

Copyright © 2010 ceramic rod factory,ceramic rod manufacturer,ceramic rod company,ceramic rod manufactor,ceramic rod price,ceramic rod telephone middia All Rights Reserved. XML map

Top